2021 PROJECTS

Alice Avenue & 100th Street Road Reconstruction
The City of Zeeland will be reconstructing Alice Avenue (from 104th to 100th) and 100th Street (from Alice to Huizenga) in 2021. Improvements include:

  • Street reconstruction
  • Storm sewer / drain improvements
  • Sump pump discharge pipes
  • Replace water main
  • Lead water service replacement
  • Sanitary sewer laterals
  • Sidewalk construction (on both north and south sides of the road)
  • Concrete drive approaches

Alice Avenue Reconstruction Project Plans

Alice Avenue Reconstruction Project Plan View

Alice & 100th Avenue Reconstruction Project Presentation

Schedule

  • February 9, 2021 Bid Opening
  • March Construction Update
  • April-October Construction
  • Construction Phased East/West of 100th Street

Updates - As of April 27, 2021

East of 101st Street

  • Pavement removal completed
  • Catch basin relocations completed
  • Sump pump laterals completed
  • Water main has been installed and is being tested. The last sampling results will come Thursday. Start water services after water main has passed, it will take 5 days for water services.
  • Underdrain to start after services are done
  • Roadway grading to start in about 1 1/2 weeks

West of 101st Street

  • Storm sewer in 104th Avenue is done and has been stubbed on Alice Avenue
  • Water main has been installed from 104th Avenue to just west of 103rd Avenue. Water main work may continue to 101st by the end of the week, or may stop for about a week, while services are being done east of 101st
  • Water services west of 101st will be in about 3 weeks

Paw Paw Avenue Reconstruction
Paw Paw Avenue (from 104th to the roadway dead end) will also undergo reconstruction. Improvements include:

  • Street reconstruction
  • Storm sewer / drain improvements
  • Water main replacement
  • Sidewalk construction (on the east side only where there is no existing sidewalk)
  • Drive approaches
  • Cul-de-sac (north end)
  • Parking area adjacent to Paw Paw Footbridge park

Schedule

  • Construction is scheduled to being April 13, 2021 with June completion

To view a presentation for this project, please click here.



Improvements are being made all around the City. If you have questions, comments or concerns about any project in the City, please do not hesitate to contact us at 616-772-0870 or by email. We are here to serve.

  1. City Services & Infrastructure


    Physical Address
    21 S Elm Street
    Zeeland, MI 49464

    Phone: 616-772-0870
    Emergency: 616-772-2001


  2. View All
line1


Proposed Projects & Improvements


  • Downtown Snowmelt
    The City of Zeeland is currently looking at the possibility of installing snowmelt to some downtown areas. View Snowmelt Study.
  • Non-Motorized Pathway Plan
    Non-Motorized Pathway Plan-FINALIZED
  • Transportation Study Implementation Matrix
    The City of Zeeland recently engaged the services of a professional transportation engineer to evaluate a number of transportation issues within the City of Zeeland. For information on the recommended changes and implementation time frame please click here.